This lot will be partially closed until August 25 at 11:59 p.m. for the Green Ally construction project.
This lot will be closed on Sunday, August 31 from 9 a.m. – 3 p.m. for the Calgary Pride Parade. Parkers can enter the lot before 9 a.m. but will not be able to exit until 3 p.m.
In the case of a discrepancy between the rates shown here and those displayed at the parking facility, the rates at the parking facility shall prevail.